Off-site construction
The phrase 'off-site construction' refers to the completion of elements or components of a construction project at a different location to where they will be permanently installed. Typically, this can involve planning, design, fabrication and assembly in purpose-built off-site factories. The completed item is then transported to site and assembled in place.
Off-site locations may be permanent manufacturing facilities, or 'flying factories', that is, temporary facilities that operate for the duration of a project and then 'fly' to a new location to service another project.
Off-site construction is often referred to as 'prefabrication', 'off-site manufacture' or 'modern methods of construction', and it may involve modular construction. It is most commonly concerned with permanent structures rather than temporary or relocatable structures.
Mark Farmer's 2017 report 'Modernise or die' adopted the term 'pre-manufacture' as '...a generic term to embrace all processes which reduce the level of on-site labour intensity and delivery risk', and suggested that this could range from '...component level standardisation and lean processes through to completely pre-finished volumetric solutions'.
Off-site construction has increasingly been promoted as a solution to many of the problems facing the UK construction industry. This is because of the significant time-efficiencies that can be achieved through using off-site techniques, as well as better safety, reduced waste, higher quality, reduced down time and so on.
Off-site construction is particularly suited to high-volume, repetitive components, or products that require factory conditions to achieve the desired level of quality. It is widely considered that housing should be an obvious target for off-site construction.
However, the initial set-up costs can be high, and it can be difficult to maintain a sufficiently consistent pipeline of demand to suit assembly line production methods. Transport costs can also be high. In addition, there have been lingering concerns regarding the label 'prefabricated' as a result of poor-quality mass-produced housing that was pre-fabricated following the second world war, as well as the Ronan Point collapse in 1968.
Modernise or die looked forward to a fourth industrial revolution underpinned by cyber-physical ‘smart’ production techniques, which it described as 'Industry 4.0’. However, it acknowledged that in many respects, construction has yet to achieve ‘Industry 3.0’ status, which would simply require large scale use of electronics and IT to automate production.
[edit] Related articles on Designing Buildings
- Advanced manufacturing.
- BSRIA launches Offsite Construction for Building Services topic guide.
- Construction problems avoided by using a modular approach.
- Design for Manufacture and Assembly (DfMA).
- Flying factory for construction works.
- In situ.
- Modern methods of construction.
- Modular buildings.
- Modular construction market report 2020-2026.
- Off site materials.
- Offsite manufacturing.
- Off-site manufacturing.
- Offsite manufacturing and standardised design.
- Off-site manufacture for construction: Building for change.
- Off site, on track.
- Off-site prefabrication of buildings: A guide to connection choices.
- Prefabrication.
Featured articles and news
The Building Safety Forum at the Installershow 2025
With speakers confirmed for 24 June as part of Building Safety Week.
The UK’s largest air pollution campaign.
Future Homes Standard, now includes solar, but what else?
Will the new standard, due to in the Autumn, go far enough in terms of performance ?
BSRIA Briefing: Cleaner Air, Better tomorrow
A look back at issues relating to inside and outside air quality, discussed during the BSRIA briefing in 2023.
Restoring Abbotsford's hothouse
Bringing the writer Walter Scott's garden to life.
Reflections on the spending review with CIAT.
Retired firefighter cycles world to raise Grenfell funds
Leaving on 14 June 2025 Stephen will raise money for youth and schools through the Grenfell Foundation.
Key points for construction at a glance with industry reactions.
Functionality, visibility and sustainability
The simpler approach to specification.
Architects, architecture, buildings, and inspiration in film
The close ties between makers and the movies, with our long list of suggested viewing.
SELECT three-point plan for action issued to MSPs
Call for Scottish regulation, green skills and recognition of electrotechnical industry as part of a manifesto for Scottish Parliamentary elections.
UCEM becomes the University of the Built Environment
Major milestone in its 106-year history, follows recent merger with London School of Architecture (LSE).
Professional practical experience for Architects in training
The long process to transform the nature of education and professional practical experience in the Architecture profession following recent reports.
A people-first approach to retrofit
Moving away from the destructive paradigm of fabric-first.
International Electrician Day, 10 June 2025
Celebrating the role of electrical engineers from André-Marie Amperè, today and for the future.
New guide for clients launched at Houses of Parliament
'There has never been a more important time for clients to step up and ...ask the right questions'
The impact of recycled slate tiles
Innovation across the decades.
EPC changes for existing buildings
Changes and their context as the new RdSAP methodology comes into use from 15 June.